Project Manager PT. Bintai Kindenko Engineering Indonesia

Pendidikan :
Tipe Pekerjaan :

Sebuah perusahaan kontraktor PMA yang berkembang dan domisili di Jakarta Pusat, membutuhkan Tenaga Terampil dan siap kerja untuk posisi :

Tanggung Jawab Pekerjaan :

Project Manager
PT Bintai Kindenko Engineering Indonesia (PT BINKEI) was established since 2012 as provide the primary business in the mechanical, electrical and plumbing construction, including
services on engineering, testing- commissioning and maintenance operation
With established and strengthen on technical, financial ,management and networking.

Requirements
________________________________________
Responsibilities
________________________________________
• To plan and manage the resources, scheduling, overhead to execute the project
• To manage the scope of work as per contract and find the resolution when non conformities occure
• To consolidate the technical and management aspect to other parties (Consultant / Project Owner)
• To evaluate effectiveness the working performance of project team, subcont (vendor)
• To provide and manage the project costing, project cash flow
• To lead and manage the project operational since of phase preparation, execution up to closing
• To provide the progress report of project performance at least on monthly base
• To achieve the project objective / goals from Top management

Persyaratan Pengalaman :

Experience as a Project Manager min. 5 Years / a Site Manager min. 8 Years (Highrise building /Factory)

Keahlian :

• Possess the M&E scope of service (MVAC, Plumbing & Sanitary, Fire Fighting & Alarm, Electrical,Electronics)
• Possess the installation technique and interpreted the technical spec and drawing
• Possess the technical specification of material, equipment and accesories of ME work
• Possess to manage and maintain the project cost, overhead and cash flow
Knowledge:
• Understand Project Management, at least scope management, cost management, procurement management
• Understand Quality & HSE management system
• Understand statistical on reporting
Profesionality:

Personal Integrity:
• Good on interpersonal skill
• Can do attitude
• Leadership, Responsibility, Honest etc

Kualifikasi :

General Requirement:
• Male
• Age : Maximum 45
• Education – Major : S1 – Mechanical, Electrical
• Experience as a Project Manager min. 5 Years / a Site Manager min. 8 Years (Highrise building /Factory)
• Good computer skil & proficiency with MS Office, MS Project
• Good command in English
Skill & Competency:
• Able to provide the master schedule, manpower schedule, procurement schedule as well as
• Able to provide the project costing sheet (RAPP)
• Prefers certified the SKA/ SKT (qualified personal for mechanical or electrical work)
• Prefers certified ISO 9001


Profile Perusahaan

Deskripsi Perusahaan

PT Bintai Kindenko Engineering Indonesia (PT BINKEI) was established since 2012 as provide the primary business in the mechanical, electrical and plumbing construction, including
services on engineering, testing- commissioning and maintenance operation
With established and strengthen on technical, financial ,management and networking.