Level Pekerjaan :
Industri :
Pendidikan :
Tipe Pekerjaan :

Job Requirements:
• Male, max. 35 years old
• Education min degree majoring in Mechanical Civil (Preferred)/Enginering/Electrical background
• Strong leadership & communication skill
• Integrity, strong leadership, energetic, good working ethics
• Honest & able to work in the tight environment
• At least minimum 1 years of working experience in the related filed is required for this position (Project Engineer)
• Having good knowledge and experience of Auto CAD, SAP, STAAD PRO, Ms Project, and Drafting.
• Preferably staff specializing in Project Engineering (Civil / Contruction / Structural or Equivalent / Mechanical / Fabrication)
• Fluent in English both written and spoken
• Having positive attitude, good communication and interpersonal skill
• Able to work both independently and as a team player
• Detail oriented and able to maintain performance under pressure with limited supervision
• Willing to based in Factory (Malang)

Tanggung Jawab Pekerjaan :

1. Project Engineering (Civil / Contruction )
2. Monitoring control activity project
3. Drafting & costing

Syarat Pengalaman :
Having good knowledge and experience of Auto CAD, SAP, STAAD PRO, Ms Project, and Drafting.
Keahlian :

• Preferably staff specializing in Project Engineering (Civil / Contruction / Structural or Equivalent / Mechanical / Fabrication)

Kualifikasi :

• Education min degree majoring in Mechanical Civil (Preferred)/Enginering/Electrical background
• Willing to based in Factory (Malang)

Tunjangan :

***Attractive Salary for qualified candidates.

Insentif :

***Attractive Salary for qualified candidates.

Waktu Bekerja :
7.00 sd 16,00

Profile Perusahaan

Deskripsi Perusahaan

A biggest ethanol producer with food grade quality, Molindo Raya Industrial, an Indonesian company is headquartered in Malang, Indonesia. With fifty years of experience in ethanol industry, Molindo has “brand recognition” in producing food grade ethanol. Both in domestic and international market. Uses cane molasses for its raw material and through fermentation & distillation, Molindo is able to produce a food grade quality ethanol. (www.molindo.co.id)